17.单选题 已收藏 标记 纠错 Two mutually exclusive projects have conventional cash flows, but one project has a larger NPV while the other has a higher IRR. Which of the following is least likely responsible for this conflict? A Reinvestment rate assumption B Size of the projects' initial investments C Risk of the projects as reflected in the required rate of return 查看解析 上一题 下一题 正确答案C 您的答案C本题平均正确率:63% NPV & IRR难度:容易 推荐:      答案解析 Conflicting decision rules based on the NPV and IRR methods are related to the reinvestment rate assumption, the timing of the cash flows, or the scale of the projects. Differing required rates of return are not related to conflicting NPV and IRR decisions. 问: 1.“ the reinvestment rate assumption”再投资假设是计算IRR的前提,计算NPV也需要这 个前提吗? 2.是不是只有传统形式的现金流机构的题目(即:开始是负,后来每年都是正,且变化只有一次),才能用金融计算器的第二排键来计算NPV或者IRR? PS:请逐次回答 谢谢

查看试题

回答(1)

Amy2019-02-20 18:06:40

同学你好,1.是的,正是由于有这个前提,我们算NPV时才需要未来现金流折现。但是我们计算时不用想那么多,会用金融计算器计算即可。
2.传统现金流指现金流变化只有一次的现金流,包括两种:开始为负,以后都为正;开始为正,以后都为负。
计算IRR使用的是CF功能,不是一排五个键。
传统现金流下才能用金融计算器计算这唯一的IRR。
非传统现金流下,如果没有IRR,金融计算器算不出IRR;如果有多个IRR,金融计算器只能算出一个IRR。

  • 评论(0
  • 追问(2
评论
追问
非传统现金流下,用金融计算器 对于NPV的计算不受影响?
追答
同学你好,NPV的计算不受影响。