13. Consider the two projects below. The cash flows as well as the NPV and IRR for the two projects are given. For both projects, the required rate of return is 10 percent. Year 0 1 2 3 4 NPV IRR (%) Project 1 −100 36 36 36 36 14.12 16.37 Project 2 −100 0 0 0 175 19.53 15.02 What discount rate would result in the same NPV for both projects? A. A rate between 0.00 percent and 10.00 percent. B. A rate between 10.00 percent and 15.02 percent. C. A rate between 15.02 percent and 16.37 percent. 请问这道题的Cross rate 怎么算?
回答(1)
张玮杰2018-05-17 09:12:58
同学你好,算起来非常繁杂,有一种简单的方法,画出NVP/IRR图